Europe's #1 partner for defence production, from first planning to stable operations.
An umbrella of battle-tested specialists spanning defence, IT, construction, and compliance. We serve programmes across the full spectrum: US defence localization in Europe, European rearmament programmes, VS-NfD and classified environments, and companies entering the defence market for the first time.
Integrated delivery of facility, operations, IT/OT and digital infrastructure, orchestrated within one unified delivery model under one accountable partner.
Establishing and scaling production capabilities and resilient, transatlantic supply chains across Europe, from greenfield to serial production.
Defence-grade IT, processes and digital infrastructure, fully aligned with EU and US regulations including NIST, CMMC, ITAR and BSI IT-Grundschutz.
Cross-functional teams built and enabled for rapid operational readiness, delivering scalable production from day one.
We take end-to-end accountability across facility, operations, IT/OT, and digital infrastructure. As a trusted network of specialists, we are the single point of contact bridging US defence plans and European industrial reality.
We orchestrate the full tier-n supply chain, build compliant IT and digital infrastructure aligned with NIST SP 800-53, NIST SP 800-171/172, CMMC, ITAR, EAR, DFARS, ISO 27001, BSI IT-Grundschutz, and VS-NfD, and build the organizations and governance structures needed to run defence production compliantly and at scale.
We deliver production readiness at record speed, covering every layer from site infrastructure to trained workforce and compliant systems.
Modular, Combinable Service Building Blocks & Horizontal Layers
Every module is combinable, from a targeted compliance project to a full factory build-out. For a single capability or an integrated end-to-end delivery, DCCE is the one partner covering all interfaces: facility, IT/OT, supply chain, compliance and organization.
We connect the service building blocks with horizontal layers and create real added value for our customers.
Integration, Partner Network & End-to-End cooperation
AI-generated image
Five phases, from the first contract draft to stable operations. Each use case can be engaged on its own or as part of the sequence; most programmes enter somewhere in the middle. Select a phase to see what we deliver there.
For suppliers and license manufacturers alike, what the contract states, or omits, takes effect across the entire product lifecycle. Later corrections to IT, security or buildings are expensive, slow and put schedules at risk.
Three regulatory strands shape every transatlantic cooperation: security standards define HOW protection works, contractual requirements define WHAT is demanded, export control defines WHO may access. Only their interplay produces compliance.
Enter negotiations with a defensible compliance position, before the contract locks in requirements for IT infrastructure, IT security, physical security and the production facility.
Compliance capability that can be evidenced is a precondition for award. The negotiation dynamic matters: US partners are experienced at setting up international supply relationships, and the entering party often negotiates from the weaker position.
Sound bids are built on technical data: drawings, specifications, bills of material. That data is typically CUI and export-controlled, and the US partner releases it only to demonstrably secure recipients. Building a full NIST SP 800-171 environment before award is uneconomical, and the bid deadline leaves no room for a long infrastructure project.
A small, shielded zone, separated physically and in the network, for receiving and reading CUI and export-controlled data. Deliberately scoped small while the award is still open, and built as the first expansion stage of the full environment.
Become able to receive and read controlled technical data within the bid deadline, without intervening in your regular processes and without overcommitting on investment.
Mistakes in handling ITAR data have serious consequences: access by an unauthorised person already counts as a deemed export.
The same architecture pattern, aligned to German classification: the protected asset is classified material at VS-NfD level.
Establish an equivalent, evidenced capability for national and European programmes, without building a second, parallel architecture next to the transatlantic one.
The contracts are signed and the first technical data is flowing. Plant build-up, IT build-up and compliance evidence now run in parallel, the partner's ramp-up schedule sets the pace, and the ATO is the gate for production start. Without secure, compliant IT there is no data release, and without data there is no production.
The encapsulated environment is the foundation. Controlled data is processed there, separated, secured and evidence-capable, from receipt through to the shopfloor.
Build the secure environment and carry the evidence through to ATO, without disturbing the running business and fast enough for the partner's ramp-up schedule.
Defence-grade full-stack experience is scarce: hardware, data centers, ERP/PLM/MES and OT all have to fit together and every building block has to be evidence-capable.
We implement the core production systems inside the secure environment and define the business processes that go with them. Process definition and system implementation come from one team.
Get PLM, ERP/WMS and MES productive on the released data state, with compliant interfaces into the secure environment and defined processes around them.
Operational technology is delivered under the same security standards as IT, and IT requirements are anchored in the construction plan while the hall is still on the drawing board.
Connect machines and plants to MES and the data platform without opening the perimeter, and get server locations, cable routes and security zones into the building plan before construction starts.
Product changes from the partner arrive continuously, systems get patched and extended, roles and access shift. The risk lies in the changes that happen without control. And every downstream process depends on the data that arrives being complete, correctly classified and traceable.
Controlled change is one of the overlapping core requirements across NIST SP 800-171, DFARS and ITAR. Our answer is a closed loop that carries every change from one compliant state to the next.
Keep the evidenced state identical to the real state, so the ATO basis stays stable and audits do not surface drift.
Without control, reality diverges from the approved baseline: audit findings, in the worst case loss of the ATO basis and a delivery stop, or misclassified data and export violations.
In contract manufacturing you are typically obliged to build an exact copy of the owner's data in your own systems, for the initial data set and for every engineering change that arrives daily, across structured and unstructured formats.
Keep data integrity along every downstream process, from receipt through engineering, purchasing, logistics and production to as-built reporting, matching the exact physical actions.
Two geographies mean two sets of rules: export control, data protection and defence confidentiality apply on both sides, and the contracting parties' IT landscapes rarely match.
The environment stands, the ATO is granted, production is ramping. Knowledge, processes and evidence still sit largely with the project team, and compliance that was only lived inside the project erodes in everyday operations. The transition follows a plan with agreed criteria.
A stable operation under all compliance requirements, run by your own organization, with the operating model designed around how your organization actually works.
Turn project mode into reliable regular operations before knowledge leaves the building with the project team, and before responsibilities and escalation paths turn out not to be anchored anywhere.
Compliance is an ongoing task. Personnel change, software updates break configurations, new suppliers enter the chain. Sustainment is what keeps a compliant state compliant.
Hold the ATO permanently and stay audit-ready out of daily operations, catching compliance drift before it becomes a finding.
For companies entering the defence market for the first time: the full fast-track path, week by week.
What it looks like when we start together.
DCCE works differently from a consultancy or a classic system integrator. We are a cooperative network of hand-picked defence specialists, united under single accountability and one shared standard: we are measured on what we deliver.
Every cooperation partner brings proven defence experience. We connect the service building blocks and horizontal layers: technology and people, IT and operations, US requirements and European reality. Our iterative approach ensures every programme remains plannable from the first CUI environment to a complete production line.
Transparency is our operating principle. Regular assessments and clear approvals keep all parties informed, and C-Level receives what it needs in order to decide.
Every cooperation partner is carefully selected. We work with specialists and we do not staff learning projects. Proven defence expertise is a prerequisite for joining the network.
From first Minimum Viable Environment to full build-out: we scale your defence capability step by step, with clear milestones and manageable risk at every stage.
One contact and clear decision structures across all cooperation partners. No hidden interfaces that become liability traps.
Mastering NIST, ITAR and ISO 27001 creates a competitive edge. We design compliance so that it enables business.
If you are facing one of these challenges, speak with us. We analyze your situation and identify concrete, proven paths forward.